Bill Gates and his energy company are starting construction at their Wyoming site for a next-generation nuclear power plant he believes will “revolutionize” how power is generated.
Archived version: https://archive.ph/3JlQL
You must log in or register to comment.
@BrikoX While I appreciate the fact that sodium cooling requires less space to build a plant than the former water-based technologies, and that it requires less human intervention to avoid an exclusion-zone-degree accident, I’m not entirely sure how will the Natrium technology reduce nuclear waste to an acceptable level, both of quantity and of safe storage conditions.