Canada’s energy regulator green-lit a last-minute change to the Trans Mountain pipeline methodology, paving the way for the $35-billion project to finally get fully built.

  • sik0fewl@kbin.socialOP
    link
    fedilink
    arrow-up
    5
    arrow-down
    1
    ·
    10 months ago

    They’re insisting that it will still achieve the target throughput in the design. There’s a PDF linked to from the article if you can make any sense of it.