Lee Duna@lemmy.nz to Technology@lemmy.zipEnglish · 1 year agoSwiss hydrogen-powered train sets 1741-mile record for nonstop travelinterestingengineering.comexternal-linkmessage-square62linkfedilinkarrow-up1145arrow-down12cross-posted to: tech@lemmit.onlinetechnology@lemmit.online
arrow-up1143arrow-down1external-linkSwiss hydrogen-powered train sets 1741-mile record for nonstop travelinterestingengineering.comLee Duna@lemmy.nz to Technology@lemmy.zipEnglish · 1 year agomessage-square62linkfedilinkcross-posted to: tech@lemmit.onlinetechnology@lemmit.online
minus-squareIlovethebomb@lemm.eelinkfedilinkEnglisharrow-up1·1 year agoI’ve never been on a construction site that didn’t have mains power, and I’ve been on quite a few.
minus-squareSupraMario@lemmy.worldlinkfedilinkEnglisharrow-up1·1 year agoAlmost everyone of them is done with a generator. Or they’re done with the crane and inspections for power have been completed and the crane is no longer needed.
minus-squareIlovethebomb@lemm.eelinkfedilinkEnglisharrow-up1·1 year agoDude, you’re full of shit. Every construction site I’ve been on has had site power.
minus-squareSupraMario@lemmy.worldlinkfedilinkEnglisharrow-up1·1 year agoCool, sounds like you’ve never stepped foot outside of the city.
minus-squareIlovethebomb@lemm.eelinkfedilinkEnglisharrow-up1·1 year agoDo they not have power outside the city where you live or something?
minus-squareSupraMario@lemmy.worldlinkfedilinkEnglisharrow-up1·1 year agoYou do know what rural is right? Power is not always available right away, and usually isn’t when they first start.
I’ve never been on a construction site that didn’t have mains power, and I’ve been on quite a few.
Almost everyone of them is done with a generator. Or they’re done with the crane and inspections for power have been completed and the crane is no longer needed.
Dude, you’re full of shit. Every construction site I’ve been on has had site power.
Cool, sounds like you’ve never stepped foot outside of the city.
Do they not have power outside the city where you live or something?
You do know what rural is right? Power is not always available right away, and usually isn’t when they first start.